Submittal Detail View

See Also

 

When project shop drawings or material samples are submitted to an engineer for review, the Submittal Detail View is used to track the progress of the submittal review. The options on this view are used to add a submittal for a project, view or modify submittal detail, or delete a submittal record. You can designate a responsible user, specify the person from whom the submittal was received, and attach documents. In addition, you can detail the workflow of a submittal's review process buy updating its status and entering dates for when the item was submitted for review, referred to another person for review, or returned as approved or for revisions.

To access this screen, click Submittals on the Projects - Logs screen and click New or click an existing submittal row on the grid.

 

 

Submittals

Assign Project:

Click this link to associate a project with a submittal record.

 

View Project:

Click this link to display the project linked with the submittal record.

 

Contacts:

This grid displays a list of contacts associated with this submittal record. Click Delete to remove a contact from the list.

 

Assign Contact:

Click this link to associate a client with the submittal record.

 

Status History:

This grid displays a history of the submittal record's status updates. Click Delete to remove a status update from the list.

 

Related Project Submittals:

This grid displays a list of existing submittals linked with the same project assigned to the submittal being edited.

 

Documents:

This grid displays a list of documents (e.g., drawings) associated with the submittal.

 

Assign Document:

Click this link to add a document for a submittal. EngineerOffice allows you to either attach an already existing document (from the server) or a new document from your device memory. Click the underlined Title to open the attached document.

 

 

Submittal No:

Enter a number for the submittal record. This number should not exceed 10 characters.

 

Type:

Make a selection from this drop-down list to specify the type of document or material submitted for approval.

Submitted By:

Make a selection from this drop-down list to specify who submitted the drawing or material or review.

Status:

Make a selection from this drop-down list to specify the status of the submittal review process.

Date Received:

Specify the date on which the submitted material or drawing was received. You also can also specify the number of copies of the item submitted for review.

 

Date Returned:

The date on which the submittal was returned to the person who submitted it for approval. The object could be returned because it was approved or because the reviewer requested some revisions. You can also specify the number of copies of the item submitted for review.

Date Returned to G.C.:

The date on which the submittal is returned to the General Contractor. You can also specify the number of copies of the item submitted for review.

 

Description:

Enter descriptive detail for the submittal record.

 

CSI#:

Select a CSI (Code Structure Identifier) code for the submitted drawing or material.

  1.  

CSI Name:

Select a CSI name for the submitted drawing or material.

 

Color:

Enter color detail for the submitted material (e.g., Austin Sunset).

 

Material:

Specify the type of material submitted (e.g., brick).

 

Referred To:

Enter the name of the person (e.g., consultant) the engineer has selected to review the submitted item.

 

Date Referred:

A date is entered in this field when the submittal has been referred to a second person (e.g., consultant) for review. For example, you might want a structural engineer to look at a shop drawing containing information about welding or bolt sizes which requires an engineer's confirmation.

 

Copies:

Specify the number of copies (e.g., 1, 2, 3...).

 

Notes:

Enter notes or comments in this field. For example, instructions on what the person responsible should look for when reviewing the submitted material.

 

Reviewer:

Select a user to review and approve the submitted drawing or material from this drop-down list.

Planned Review Date:

Specify the date on which the submitted items are due.

 

Create To-Do:

Click this link to add this submittal to the responsible employee's EngineerOffice To Do list.

 

Button Panel

Action

 

New:

Select this option to create a new submittal record.

 

Delete:

Select this option to delete a submittal from the system. Only users with proper security privileges to delete submittals can do this.

 

Help:

Opens the EngineerOffice Help in the Submittal section.

 